INFRASTRUCTURE ENGINEERING

 
 
Amtrak+Bridge+Replacement_2.jpg

TEMPORARY WORKS

• BRIDGES AND TRESTLES

• SHORING SYSTEMS

• HEAVY MOVING

• SUPPORT OF EXCAVATION

• STRUCTURAL LIFTING

• FORMWORK

bridge+erection+1.jpg

ERECTION ENGINEERING

• CRANE PICK PLANNING

• RIGGING DESIGN

phasing.jpg

WORK-ZONE PLANNING

• M.P.T.

• STAGED CONSTRUCTION

4831934326_1b334b9d20_o.jpg

MARINE WORKS

• BARGE CRANE PICK PLANNING

• TOW BARGE STABILITY

• BRIDGE FLOAT IN/FLOAT OUT

• LASHING AND SEA FASTENING

• LOADOUT OF HEAVY STRUCTURES